PLC first receives the elevator signal and flat-layer signal from the elevator, and then according to the state of these input signals, through a series of complex control programs within it, the logo of various signals The series relationship is processed in an orderly manner, and finally the switching volume control signal is sent to the DC gate control motor, frequency converter and various displays in a timely manner to control the elevator.
PLC control replaces traditional relay control, which has become a definite development. PLC is a new automatic control device integrating computer control, automatic control technology and communication technology.
There is a layer of the elevator control system, office telephone, optional layer selection manual, automatic functions, such as parliamentary election.
On the basis of the general frequency converter, PLC is used to control the elevator. Through reasonable selection and design, the control level of the elevator is improved, and the comfort of elevator operation is improved, so that the elevator can achieve a more reasonable control effect.
1. They are all key points, no difficulties. The key is that you need to have a physical inspection program you write.Go to the large Xinhua Bookstore to the books about PLC published by Machinery Industry Press. Other publishers have almost no value.
2. The equipment is large and has poor reliability. Slow action and few functions. It is difficult to achieve complex control, the wiring is complex, and the versatility and flexibility are poor.
3. Hello, it's my pleasure to solve the control of the elevator for you, online, library, everywhere.
4. Use different common points of PLC. 2) The common points of the output points of the same grade and type of voltage can be directly short-circuited. 3) The output point of the pulse signal needs to use a high-number counter, and I0.0 is usually used as the input point. 4) When assigning output terminals, the high-voltage part is usually in the front and the low-voltage part is in the back.
5. System settingThe workload is small, the maintenance is convenient, and it is easy to transform the PLC with storage logic to replace the wiring logic, which greatly reduces the external wiring of the control equipment, greatly shortens the cycle of control system design and construction, and makes daily maintenance easier. More importantly, the same equipment changes the production after changing the program. Cheng becomes possible.
1. Design purpose and requirements of three-story elevator design (1) The elevator is called and operated by the up and down call buttons installed at the door of each floor hall. Its operation content is the direction of elevator operation. (2) The elevator car is equipped with a floor selection button S1~S3, which is used to select the floor that needs to be parked.
2. I/O allocation on the basis of understanding the process.Carry out the software design of the PLC control system and draw functional diagrams, ladder diagrams and circuit diagrams. Design and draw process drawings, specifically including electrical panel layout drawings and wiring diagrams.
3. It mainly involves the overall design scheme, composition and modular program design of the PLC control system of the 5-storey elevator.
4. When the programmable logic controller is put into operation, its working process is generally divided into three stages, namely input sampling, user program execution and output refresh. Completing the above three stages is called a scanning cycle. During the whole operation, the CPU of the programmable logic controller repeats the above three stages at a certain scanning speed.
5. "Original" three-story elevator model PLC control system design and debugging (with program annotation) [2009-3-24 8:27:00 | By: Tim ]0 Recommendation Control Requirements: 1. The system should have three working modes: driver, driverless, and firefighting.
and the price of single-chip microcomputer is quite cheap. If the anti-interference function is improved, it can completely replace PLC to realize the control of industrial control equipment. Of course, the single-chip microcomputer is not as targeted as the PLC, so the control system designed by the single-chip microcomputer can be constantly modified and improved with the update of the equipment to achieve the upgrade of the equipment more perfectly.
Instruction: A number specified by the designer of the single-chip microcomputer chip, which has a strict one-to-one correspondence with our common instruction mnemonic and cannot be changed by the developer of the single-chip microcomputer.
The system can be divided into two major parts: the elevator control module and the control panel module. 2. Bus communication interaction between the elevator control module and multiple control panels. 3. LiftControl includes motor control, elevator door control, communication with the control panel, operation logic judgment, error detection, etc. 4.
UEFA Champions League live-APP, download it now, new users will receive a novice gift pack.
PLC first receives the elevator signal and flat-layer signal from the elevator, and then according to the state of these input signals, through a series of complex control programs within it, the logo of various signals The series relationship is processed in an orderly manner, and finally the switching volume control signal is sent to the DC gate control motor, frequency converter and various displays in a timely manner to control the elevator.
PLC control replaces traditional relay control, which has become a definite development. PLC is a new automatic control device integrating computer control, automatic control technology and communication technology.
There is a layer of the elevator control system, office telephone, optional layer selection manual, automatic functions, such as parliamentary election.
On the basis of the general frequency converter, PLC is used to control the elevator. Through reasonable selection and design, the control level of the elevator is improved, and the comfort of elevator operation is improved, so that the elevator can achieve a more reasonable control effect.
1. They are all key points, no difficulties. The key is that you need to have a physical inspection program you write.Go to the large Xinhua Bookstore to the books about PLC published by Machinery Industry Press. Other publishers have almost no value.
2. The equipment is large and has poor reliability. Slow action and few functions. It is difficult to achieve complex control, the wiring is complex, and the versatility and flexibility are poor.
3. Hello, it's my pleasure to solve the control of the elevator for you, online, library, everywhere.
4. Use different common points of PLC. 2) The common points of the output points of the same grade and type of voltage can be directly short-circuited. 3) The output point of the pulse signal needs to use a high-number counter, and I0.0 is usually used as the input point. 4) When assigning output terminals, the high-voltage part is usually in the front and the low-voltage part is in the back.
5. System settingThe workload is small, the maintenance is convenient, and it is easy to transform the PLC with storage logic to replace the wiring logic, which greatly reduces the external wiring of the control equipment, greatly shortens the cycle of control system design and construction, and makes daily maintenance easier. More importantly, the same equipment changes the production after changing the program. Cheng becomes possible.
1. Design purpose and requirements of three-story elevator design (1) The elevator is called and operated by the up and down call buttons installed at the door of each floor hall. Its operation content is the direction of elevator operation. (2) The elevator car is equipped with a floor selection button S1~S3, which is used to select the floor that needs to be parked.
2. I/O allocation on the basis of understanding the process.Carry out the software design of the PLC control system and draw functional diagrams, ladder diagrams and circuit diagrams. Design and draw process drawings, specifically including electrical panel layout drawings and wiring diagrams.
3. It mainly involves the overall design scheme, composition and modular program design of the PLC control system of the 5-storey elevator.
4. When the programmable logic controller is put into operation, its working process is generally divided into three stages, namely input sampling, user program execution and output refresh. Completing the above three stages is called a scanning cycle. During the whole operation, the CPU of the programmable logic controller repeats the above three stages at a certain scanning speed.
5. "Original" three-story elevator model PLC control system design and debugging (with program annotation) [2009-3-24 8:27:00 | By: Tim ]0 Recommendation Control Requirements: 1. The system should have three working modes: driver, driverless, and firefighting.
and the price of single-chip microcomputer is quite cheap. If the anti-interference function is improved, it can completely replace PLC to realize the control of industrial control equipment. Of course, the single-chip microcomputer is not as targeted as the PLC, so the control system designed by the single-chip microcomputer can be constantly modified and improved with the update of the equipment to achieve the upgrade of the equipment more perfectly.
Instruction: A number specified by the designer of the single-chip microcomputer chip, which has a strict one-to-one correspondence with our common instruction mnemonic and cannot be changed by the developer of the single-chip microcomputer.
The system can be divided into two major parts: the elevator control module and the control panel module. 2. Bus communication interaction between the elevator control module and multiple control panels. 3. LiftControl includes motor control, elevator door control, communication with the control panel, operation logic judgment, error detection, etc. 4.
bingo plus update today Philippines
author: 2025-01-07 05:24998.88MB
Check743.87MB
Check477.18MB
Check388.69MB
Check586.76MB
Check449.62MB
Check492.93MB
Check727.87MB
Check557.53MB
Check412.69MB
Check466.71MB
Check913.74MB
Check342.72MB
Check729.11MB
Check614.47MB
Check282.58MB
Check147.36MB
Check376.12MB
Check463.81MB
Check213.24MB
Check625.84MB
Check595.65MB
Check847.72MB
Check791.78MB
Check196.81MB
Check138.31MB
Check517.61MB
Check717.82MB
Check512.74MB
Check976.21MB
Check328.81MB
Check587.79MB
Check549.91MB
Check526.89MB
Check841.19MB
Check187.92MB
CheckScan to install
UEFA Champions League live to discover more
Netizen comments More
2727 casino plus free 100
2025-01-07 07:06 recommend
1156 100 free bonus casino no deposit GCash
2025-01-07 06:46 recommend
2542 Hearthstone Arena class tier list 2024
2025-01-07 06:42 recommend
1657 Casino free 100 no deposit
2025-01-07 06:40 recommend
1000 Hearthstone Wild Decks
2025-01-07 06:35 recommend